NEA
Technical Research Reports
Search our technical reports here. You can use the search bar, tags or the quick filter links below:
Filter Events By
Hybrid heat pumps, infrared radiators and Sunamp heat stacks (CP780)
Post on 25th Aug 2018
Ongo Homes installed three different types of innovative full heating systems into 30 properties from their social housing stock. Existing heating was removed and replaced with one of the three technologies: 14 Logicor infrared radiator systems, 10 Daikin Altherma hybrid heat pumps and six Sunamp heat batteries.
Content Type:Publications
Daikin hybrid heat pump (CP759)
Post on 25th Jun 2018
After the successful delivery of a project that replaced electric storage heaters with hybrid heat pumps Home Group were invited to run an additional hybrid heat pump project. This project replaced gas boilers that were due for renewal with Daikin Altherma Hybrid heat pumps. The hybrid system combines an air to water heat pump alongside a condensing combination gas boiler to provide heating and hot water. The system can automatically select the most cost effective and efficient heating mode based on external and internal temperatures, the space heating and hot water demand, and the current cost of gas and electricity.
Content Type:Publications
Heat Pumps for Park Homes, Basingstoke (CP753)
Post on 26th Sep 2017
This project was delivered by YES Energy Solutions in collaboration with Basingstoke and Dean Borough Council.
Content Type:Publications
Heat Pumps for Park Homes, Basingstoke (CP753)
Post on 06th Sep 2017
This project was delivered by YES Energy Solutions in collaboration with Basingstoke and Dean Borough Council to establish running costs of air-to-air source heat pumps (ASHP) in a park home setting, ultimately reducing heating costs for residents of Attwood Close park home site; examine customer satisfaction levels with ASHPs as a heating system; and provide a case study to be applied for future park home sites.
Content Type:Publications
Daikin Altherma hybrid heat pumps, Copeland and South Tyneside (CP747)
Post on 06th Sep 2017
This project involved installing Daikin Altherma hybrid heat pumps in 24 properties. It also required connection to the gas grid which was funded separately via the Fuel Poor Network Extension Scheme (FPNES) through Northern Gas Networks, which incentivises the regulated gas network companies to connect low-income households and communities to the mains gas network.
Content Type:
© 2025 NEA all rights reserved.